Free delivery on orders over £499

Call us on 020 7096 0899

Live Chat available

  • Free delivery

    On all orders over £499

  • Special offers

    Regular sales and discounts

  • 14 days returns

    Hassle free returns policy

  • Chat facility

    Talk to a real person

Get an extra 10% off Almost Everything*

AUTUMN10
SKU: WBS1585L

Nuie L-Shaped Shower Bath Without Bath Panel

£281.99 £563.00
Bath Size
Handed

Delivery

Our orders are usually delivered within 3 – 5 business days. You will either be contacted by phone or will receive a SMS message confirming the delivery day.

In the case of pallet deliveries, these are to the kerb side. Please ensure you have the facility to move the goods in to a safe storage area.

Nuie L-Shaped Shower Bath Without Bath Panel

The Nuie L-Shaped Shower Bath offers the perfect combination of style and functionality, making it an ideal choice for modern bathrooms where space efficiency is key. Crafted from high-quality sanitary-grade acrylic in a crisp white finish, this bath is designed to be both durable and visually striking. The L-shaped design provides a generous showering area while maintaining a sleek, contemporary aesthetic. With an un-drilled surface, it allows for flexible tap positioning to suit your preferred layout. Supplied with a sturdy leg set for stability, this bath is designed for use with a bath screen to create a seamless shower enclosure. Available in both left and right-handed configurations, it offers versatility to fit various bathroom layouts. Please note that bath panels are sold separately, allowing you to personalize the final look to your taste. Backed by a five-year guarantee, this stylish shower bath is a practical and elegant solution for modern living.

4 bath sizes;

1500 x 850mm

1600 x 850mm

1700 x 850mm

1800 x 850mm

2 handed versions;

Left handed

Right handed

The bath is not supplied with a bath waste or bath screens. See 'You may need'.

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Maestro
  • Mastercard
  • PayPal
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.